• You999@sh.itjust.works
    link
    fedilink
    arrow-up
    5
    arrow-down
    2
    ·
    6 months ago

    Here’s some highlights from the sources I put in the original comment since you can’t be asked to open them…

    Clay, New York: Funding will support the construction of the first two fabs of a planned four fab “megafab” focused on leading-edge DRAM chip production. Each fab will have 600,000 square feet of cleanrooms, totaling 2.4 million square feet of cleanroom space across the four facilities—the largest amount of cleanroom space ever announced in the United States and the size of nearly 40 football fields.

    Boise, Idaho: Funding will support the development of a high-volume manufacturing (HVM) fab, with approximately 600,000 square feet of cleanroom space focused on the production of leading-edge DRAM chips. The fab would be co-located with the company’s existing, leading-edge R&D facility to improve efficiency across its R&D and manufacturing operations, reducing lags in technology transfer and cutting time-to-market for leading-edge memory products.

    at least $40 million in dedicated CHIPS funding for training and workforce development to ensure local communities have access to the jobs of the future.

    the U.S. Department of Energy (DOE) through its Loan Programs Office (LPO) today announced the closing of a $362 million loan to CelLink Corporation (CelLink) to help finance the construction of a domestic manufacturing facility that will produce components essential to electric vehicle (EV) assembly. Located in Georgetown, Texas, the facility will develop lighter and more efficient flexible circuit wiring harnesses—sets of wires and related equipment that relay information and carry electricity throughout vehicles. Once fully operational, the facility is expected to produce enough wiring harnesses to support the manufacture of approximately 2.7 million EVs per year and create 165 construction jobs and more than 1,200 permanent jobs.

    The official source for the solar for all does have a broken link which is supposed to direct you here where it explain each of the 60 grants that were issued.

    To awnser your question, production.

    • queermunist she/her@lemmy.ml
      link
      fedilink
      arrow-up
      10
      arrow-down
      3
      ·
      6 months ago

      It’s cool how you just take them at their word.

      But my point is that none of this is being done efficiently. Instead, middlemen siphon money from the project to pad their pockets and stretch out the timelines for completion. I won’t be surprised if some of these projects go over budget, over time, or need additional funding.

      Wake me up when these projects complete. Then we can look at how much they really cost and how long it really took and how much they really produce.

        • queermunist she/her@lemmy.ml
          link
          fedilink
          arrow-up
          5
          ·
          6 months ago

          The money does not go directly to production, that’s the goal post. It goes through a dozen people’s hands before the ground is ever broken on one of these projects, and every one of those hands takes their cut to pad their pockets. That was my point.